In addition, roads and adjoining sidewalks have been built, and the footpath work for the pedestrian traffic inside the locality has been continuing.
The gas distribution pipeline (medium-pressure gas pipeline) has also been completed and approved.
Permit procedures on water and sewage, including communications, are under way.
Back to list
pozemky pro váš dům